Driving the shovel - day two....

With church and bible study, I only had a few hours to work today, but I managed to get the main line almost complete.  As far as excavating, all the is left is the north end gutter pipe across to the french drain and the end out from  the end of the house under the fence and to the alley way.  We also planted the last of the 24 original squares today - 2 spinach, a radish and a mesclun - Maegan actually put the seeds in the ground and then we gave them a quick blessing.  Time to update the spreadsheet.


I have to figure out how much drainage rock I am going to need....  let see...  pi*r squared or something like that...  8"x8" x 70' - pi x 2.25"squared x 70' = some calculations, etc - say 3 cu yds should do the trick and leave a bit extra for around the A/C's.